Tuesday, 1 November 2016

Solution Manual for Simulation with Arena 6th Edition by Kelton-09

For This And Any Other test Bnaks, slotion Manuals, Quizess, Exams And Assignments Contact us At whiperhills@gmail.com

Exercise 2-9 Solution file from Kelton/Sadowski/Zupick, Simulation With Arena, 6th edition, McGraw-Hill, 2015
The drill press is down for 4 of the 20 minutes, so the proportion of downtime is obviously 4/20 = 0.20, and this will be true regardless of what the interarrival and service-time input data happen to be. From the solution to Exercise 2-8, the drill press is busy all the rest of the time (16 minutes) so the proportion of time up and busy is 16/20 = 0.80 and the proportion of time idle but up is 0; these last two figures will, however, be dependent on what the interarrival and service-time data happen to be.
This file was downloaded
from the Solutions area of
the website for the 6th ed.
of "Simulation With Arena"
by Kelton, Sadowski, and
Zupick, McGraw-Hill, 2015.

No comments:

Post a Comment