Exercise 2-2 Solution file from Kelton/Sadowski/Zupick, Simulation With Arena, 6th edition, McGraw-Hill, 2015
Since S(t) = Q(t) + B(t) at any time t, and by linearity of integrals,
         
T T T T
S t dt Q t B t dt Q t dt B t dt
0 0 0 0
( ) ( ) ( ) ( ) ( ) ,
where T is the fixed ending time of the simulation (T = 20 for this example). Dividing this relation through by T, we
see that the time-average level of S(t) can be obtained by adding the time-average level of Q(t) to the time-average
level of B(t), both of which are already being computed; thus, the time-average level of S(t) could have been
obtained from the existing output without adding any state variables.
In general, to get the maximum level of the pointwise sum of two curves, we cannot just add the maximum
values of the two curves together since these maxima might not have occurred at the same time, so it would
generally be necessary to keep the new state variable representing the new curve to get the maximum level. In this
particular example, though, the logic implies that the maximum of the queue length Q(t) would have to be obtained
when the server is busy (if that ever happens), i.e., when B(t) = 1, its maximum, so that the maxima of the two
curves do occur at the same time. So, in this example, it is valid to add the maximum of Q(t) to the maximum of
B(t) to get the maximum of S(t), so that the new state variable tracking S(t) would not have been necessary.